Laserfiche WebLink
~ iii iiiiiiiiiiiuiii <br />_ STATE <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Sl., Room 215 <br />Denver, CO 8020] <br />Phone: 130]1866-3567 <br />FA%:13031 8 32-81 06 <br />h° <br />OF COLORADO <br />OF'~~(O <br />~~' f~ <br />Fes;:- <br />~.~ <br />~ /876 <br />December 13, 1993 <br />Mr. Joe Conrado <br />Meeker Sand and Gravel, Iric. <br />3251 RBC #4 - PO Box 1550 <br />Meeker, CO 81641 <br />Re: Meeker Pit, Succession Approval <br />Dear Mr. Conrado: <br />Roy Romer <br />Governor <br />Michael B Lonl; <br />Division Direurn <br />Permit No. M-76-038. Revision No. SO-003 <br />On December 2, 1993 the Colorado Mined Land Reclamation Board approved the <br />succession of operators from frontier Materials Inc. to Meeker Sand and Gravel, Inc. <br />for this operation. Meeker Sand and Gravel, Inc. is now the permitted operator of <br />the Meeker Pit, and as such, is responsible for all provisions in Permit No. <br />M-76-038 as well as those specified in the Minerals Rules and Regulations. <br />Frontier Materials Inc. is relieved of all responsibilities concerning this <br />operation (See Mineral Rules and Regulations Number 1.7>. <br />The Division would like to remind you, as the permitted operator, about a few things <br />we feel are important: <br />1. All of the application materials, as amended and supplemented, are an integral <br />part of your permit. They have been incorporated into the permit by reference. We <br />presume that you have a copy of all of these materials; therefore, none have been <br />enclosed with this mailing. We suggest that you keep a copy of the permit and the <br />permit application at the mining operation as a reference for operating personnel, <br />to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest consulting <br />the Mineral Rules and Regulations and/or contacting us to determine if a revision to <br />the permit is necessary. Rule 1.8 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual fee and <br />annual report to us. Please consult Rule 3.4 for 110 Mineral Permits, Rule 2.4 for <br />112 Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, contact me. <br />Si~erely, <br />William C. Yo~k-Feirn <br />Environmental Protection Specialist <br />WCY/ern 6742G <br />