My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91815
DRMS
>
Back File Migration
>
Revision
>
REV91815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:19 AM
Creation date
11/21/2007 11:15:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
12/4/1987
Doc Name
IMPLEMENTATION OF DRAINAGE PLAN AND WASTE PILE SIDE COLLECTION DITCH CONSTRUCTION NEW ELK MINE PN C-
From
WYOMING FUEL CO
To
MLRD
Type & Sequence
TR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />Ul~oming Fuel Com~on~ <br />Golden Eagle/New Elk Mines <br />Star Route • Weston, Colorado 81091 • Telephone (303) 868-2761 <br />December 3, 1987 <br />M11r. Jim Stevens <br />Reclamation Specialist <br />1313 Sherman <br />Denver, Colorado 80203 <br />Re: Implementation of drainage plan and waste pile side collection ditch <br />construction, New Elk Mine Permit C-012-81. <br />Dear Mr. Stevens: <br />As per our meeting of November 27, 1987, WFC is proposing to complete the <br />New Elk drainage prior to run-off which will occur on or about June 1, 1988. <br />Under the current plan WFC will begin work at pond 007A. We will work in a <br />westerly direction from pond 007A. The West Portal Area will be scheduled <br />last as we are considering alternatives for placement of culvert C27 and <br />construction of the laydown area. A progress map will be posted at the New <br />Elk Mine office. At the end of each month work completed will be shown on <br />this map as well as a summary of percent complete. Plan changes will also be <br />noted. We expect some changes during the construction phase. If these changes <br />are significant, we will contact you regarding the need fora minor or techni- <br />cal revision to our plan. <br />We are currently reviewing alternative methods for side collection ditch <br />construction at the New Elk waste pile. As you know we are considering using <br />a fiber blanket product. After this evaluation is complete and we find the <br />alternative plan is feasible, WFC will submit a revision to the Division. If <br />alternatives are not feasible, we will comply with the current design. Pres- <br />ently, we are planning to utilize an outside contractor to do this work. <br />We cannot meet the abatement date of December 15, 1987, for side collec- <br />tion ditch construction. The strike ended November 23, 1987. We request a <br />minimum of 90 days to evaluate, scope, bid and select a contractor to begin <br />work on the waste pile and side collection ditches. If this plan is accept- <br />able, please advise by appropriate correspondence. If you have any questions <br />or would like to discuss this further, please call. <br />~7~~~g~i+D Sincerely, ~-~" <br />SEC y 199987 ~d~11~(5T~ <br />RECD Mq ~GNO1V1$IpM Environmental Coordinator <br />DS/bjb <br />cc: Harry Elkin <br />
The URL can be used to link to this page
Your browser does not support the video tag.