My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91717
DRMS
>
Back File Migration
>
Revision
>
REV91717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:13 AM
Creation date
11/21/2007 11:14:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977317
IBM Index Class Name
Revision
Doc Date
9/20/1994
Doc Name
CEDARWOOD CLAY MINE SUCCESSION APPROVAL PN M-77-317 REVISION SO-001
From
DMG
To
SUMMIT BRICK AND TILE CO
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ • • III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DeVartment of Natural Resources <br />131 3 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FA%:13031 83 2-81 06 <br />September 20, 1994 <br />Mr. Joseph C. Welte <br />Summit Brick and Tile Co. <br />13th & Erie <br />Pueblo. CO 81001 <br />Re: Cedarwood Clay Mine, Succession Approval <br />No. SO-001 <br />Dear Mr. Welte: <br />~~~~~ <br />DEPARTMENT O <br />NATURAL <br />RESOURCE: <br />RoY Ruiner <br />eo, er,u,. <br />la mcs 5. L~K hhead <br />Exec W rce Direr urt <br />M¢hael H Lung <br />Divisum I7ne, w. <br />Permit No. M-77-317, Revision <br />On September 20, 1994 the Colorado Mined Land Reclamation Board approved the <br />succession of operators from Red Mountain Clay Company to Summit Brick and <br />Tile Co. for this operation. Summit Brick and Tile Co. is now the permitted <br />operator of the Cedarwood Clay Mine, and as such, is responsible for all <br />provisions in Permit No. M-77-317, as well as those specified in the Minerals <br />Rules and Regulations. Red Mountain Clay Company is relieved of all <br />responsibilities concerning this operation (See Mineral Rules and Regulations <br />Number 1.12). <br />The Division would like to remind you, as the permitted operator, about a few <br />things we feel are important: <br />1. All of the application materials, as amended and supplemented, are an <br />integral part of your permit. They have been incorporated into the permit by <br />reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you <br />keep a copy of the permit and the permit application at the mining operation <br />as a reference for operating personnel, to help ensure compliance with the <br />terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Mineral Rules and Regulations and/or contacting us to determine <br />if a revision to the permit is necessary. Rule 1.10 pertains .to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule l.ll to Conversions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.