Laserfiche WebLink
J. E. STOVER 8~ ASSOCIATES <br />2788 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81508 <br />PHONE: (970) 245101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />April 1, 1998 <br />J. J. Dudash <br />Division of Minerals & Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie No. 2 Mine <br />Technical Revision No. <br />Mine Plan Changes <br />Permit C-96-083 <br />Dear Mr. Dudash: <br />III IIIIIIIIIIIIIIII <br />999 <br />CINL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIvEU <br />'APR 0 3 1998 <br />Division of Minerals tx ueorogy <br />The DMG's letter dated March 25, 1998 transmitted additional adequacy concerns <br />regarding the referenced technical revision application. Following are BRL's responses <br />to the DMG's concerns: <br />28. Enclosed are revised pages 2.05-47& 48 page 3 of Exhibit 7 and revised Map <br />No. 32, Topsoil Distribution Plan, which shows the location of the topsoil <br />stockpiles and the areas and depths where topsoil will be spread. Page 3 of <br />Exhibit 7 was revised to indicate the soil amendment recommendations were <br />applicable to the topsoil prior to it being salvaged. Map 32 was revised to show <br />that topsoil will be spread on all of the disturbed areas including the lower <br />portions of the road fills and the upper portions of the road cuts. <br />29. BRL has no comment on the updated reclamation estimate. <br />Please call if you have any questions. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />