Laserfiche WebLink
• • iiiiiiiiiiiiiiiiii <br />y~ <br />(1~) EXHIEIT "L" - Pasic Reclarnatic~r~ Casts <br />This item has beer. estimated t~:~ reflect 'the mining <br />process ..f 5 acre acres tr_. be open at ar~y one tune. <br />Assurnir~g that approximately 1,Or_i0 L.F. ~.r shr_~r~e lure <br />will be reclaimed at ar~y one tune, the topsoil and ore <br />burden are within SOiI+ ..f the shore line, then the following <br />cost applies for the reclamation r_~f that shore lime: <br />1, Leveling & Grading <br />R. Overburden: Avg. .,f 15/cy backfill/foot ~~f <br />shore line x 1,000+ = 15,OrJO cy <br />D-3 CRT ~SOcy/hr/Silil+ is $110/hr = S1i.44/cy <br />15, Oin? cy x ~b0. 44/cy = $ 6, 600. 00 <br />H. Egl_lipment; D-3 Dozer, Wheel Loader, r Motor <br />Grader <br />~. Top Soil <br />R. ~:I.Scy topsoil/foot of shore line x lllllll' _ <br />~Iji IcY <br />D-d CRT c50cy/hri5ilil+ ie 5;110/hr = 30, 44/cy <br />Si li lcy x 5;0, 44/cy = $ cBU. ! i0 <br />~, Seeding <br />A. ~O x~1.Inds ~_f seed @ $40/acre <br />E. 15 p~ ~~.Irids ~ ~f cover crap @ $13/acre <br />C. L~roor and Equipment ~? 325/acre <br />D. r_q~.i >. preen*.; Dri11 and/..r Proadcast Seeder ip <br />5;73/acre <br />TOTAL: 516/acre x 1.~ acres = $ 190.OC1 <br />4. Trees and G'lantings <br />i~. ~.~~~tt~_,nless Cottonwood a. R~.ISh Tril Obato <br />tSw~.ink CEr~.ISn), Chr_~ke Cherry, Rmerican Rl~.un, <br />i~~otner~ ~.J.illow and RLISS1aYi Olive. <br />$ JOII, IIII <br />~. Anrn_lal ~hair~tenance ~b c50.00 <br />