Laserfiche WebLink
<br />ADCO CONSULTING <br />• iii iiiiiiiiuiiiiii <br />CHEROKEE INVESTMENTS iNC. <br />2090 EAST 109TH AVENUE. SUITE 305 <br />`-1 E l; F l ~! F f. Tr+oRNTON. CoroRr~oo eoz33 <br />May 3, 1995 MqY D ~ 1995 13o319so-zzo~ <br />Mr Gary Curtiss, Reclamation Specialist <br />Division of Minerals and Geology Division of Iminerals ~ ueoiogy <br />1313 Sherman Street, Room #215 <br />Denver, Colorado 80203 <br />Re: Technical Revision Request, Sandy Acres Pit M-80-1 10 <br />Dear Mr. Curtiss <br />On the above referenced request, the estimate for completion of mining was stated as between <br />late 1995 and sometime in 1996. This estimate was based on the previous accelerated mining that <br />had been taking place over the last several years, when there were a number of large projects in <br />the Denver Metropolitan area that utilized sand and gravel resources, particularly Denver <br />International Airport. Since most of these "large" types of projects have been completed, amore <br />realistic time schedule for completion of mining is between 1996 and the year 2000. <br />Sincerely, <br />r <br />Robert N. Flemi~ <br />cc: Cooley Gravel Company, c/o Mike Reefer <br />Colorado Sand and Gravel Co., c/o Robert Siegrist <br />Adams County Planning Department, c/o Craig Tessmer <br />