My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90862
DRMS
>
Back File Migration
>
Revision
>
REV90862
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:31 AM
Creation date
11/21/2007 11:07:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980002
IBM Index Class Name
Revision
Doc Date
10/8/1993
Doc Name
FORMAL PUBLIC HEARING BOND INCREASE OC 2 MINE C-80-002
From
DMG
To
OC COAL MINE
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • iiiiiiiiiiiiiiiiiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SI., Room 215 <br />Denver, CO 80203 <br />Phone. 1303) 866-3567 <br />FAX (303) 8328106 <br />October 8, 1993 <br />Mr. Robert Weaver <br />O.C. Coal Mine <br />P.O. Box 539 <br />Gunnison, Colorado 81230 <br />RE: Formal Public Hearing, Bond Increase, O.C. No. 2 Mine, C-80-002 <br />Dear Mr. Weaver: <br />pF. ~~(O <br />~'~ 4 <br />~~ -, b <br />•~o <br />. t <br />~ re]6 <br />Roy Romer <br />Governor <br />M¢hael B. long <br />Drvnion DireUOr <br />On September 22, 1993 the Mined Land Reclamation Board voted to continue the formal <br />public hearing for the Division's proposed bond increase until the December 15th and 16th <br />Board hearing. The Board set a deadline of December 1st for the O.C. No. 2 mine either <br />to reduce the reclamation liability or until December 15th to increase the bond amount. <br />During the meeting you pointed out several items in the reclamation liability estimate that <br />do not require a reclamation bond such as the two culverts and the portal shed roof. The <br />Division will remove these items from the cost estimate. The Division will work with you to <br />ensure that the reclamtion cost estimate is as accurate as possible. The Board expressed <br />concerns that the mine site be adequately posted and that the hazards to the public be <br />minimized as much as possible. <br />If you have any questions please call me. <br />Sincerer, <br />=~.-..1,~~~ <br />Randall P. Price <br />Reclamation Specialist <br />RI'P/rPP/aboposl.wp <br />c: Barbara Stratman <br />Craig Kaffenberger <br />
The URL can be used to link to this page
Your browser does not support the video tag.