My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90851
DRMS
>
Back File Migration
>
Revision
>
REV90851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:30 AM
Creation date
11/21/2007 11:07:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/20/2001
Doc Name
WEST ELK MR-277 AND MR-278 ADEQUACY
From
DMG
To
MOUNTAIN COAL CO LLC
Type & Sequence
MR277
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiiiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 D I v 15 1 0 N O F <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 MINERAL S <br />FAX: 1303) 832-8106 & <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFE TY <br />gill Owens <br />Governor <br />Greg E. Walther <br />Mr. Henry Barbe 20 July 2001 Eveculive Direuor <br />Mountain Coal Com an LLC Michael B. Long <br />P Y Dwis~on Dve<lor <br />P.O. Box 591 <br />Somerset CO 81434 <br />Re: West Elk MR-277 and MR-278 Adequacy <br />Deaz Mr. Bazbe: <br />The Division has reviewed Mountain Coal Company's submittals of MR-277 and MR-278 for <br />additional boreholes to vent methane has from [he mine. <br />The Division has comments requestingl additional information is submitted that will enable us to <br />provide a reclamation cost estimate and formulate along-term schedule to follow as this drilling <br />program procedes. <br />The Division requests that MCC submit a current map showing roads, drillholes and drill pads <br />for the proposed activities. Designation should be provided for the roads to indicate the level of <br />maintenance that was required to use these roads and the subsequent reclamation that will be <br />performed, according to MCC's interaction with the US Forest Service. Information should be <br />provided for the drillholes, including proposed depth, diameter of the hole, type of drilling and <br />any other information pertinent to reclamation. A schedule should be provided that shows the <br />Division when MCC plans to access these drill pads. Receipt of this information will allow the <br />Division to make a more informed and timely decision on the proposed activities. <br />If you have any questions, please feel free to call me. <br />~ncerely, <br />t~/ ~~ <br />Jim Burnell <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.