Laserfiche WebLink
ii~riii~~riuru~-i <br />TABLE OF CONTENTS <br /> <br />• <br />• <br />4.0 OPERATION AND RECLAMATION PLANS 1 <br />4.1 Objectives and Background 1 <br />4.2 General Operation Plan - Life of Operations and <br /> Five-Year Permit Period 1 <br /> 9.2.1 Loading Methods and Equipment 2 <br /> 9.2.2 Roads 2 <br /> 4.2.3 Cut and Fill Volumes 3 <br /> 9.2.9 Signs and Markers 3 <br /> 9.2.5 Permit, Disturbed, and Affected Acreages 9 <br /> 9.2.6 Personnel Requirements 4 <br /> 4.2.7 Power Requirements 9 <br /> 9.2.8 Surface Facilities 5 <br /> 4.2.9 Ponds and Diversions 6 <br /> 9.2.9.1 Ponds 6 <br /> 9.2.9.2 Diversions and Culverts 7 <br /> 4.2.10 Topsoil Removal, Handling and Storage 8 <br /> 9.2.11 Disposal of Refuse Material 8 <br /> 4.2.12 Blasting 8 <br />4.3 Reclamation - 5-Year Permit Period and Life of <br /> Operation 9 <br /> 4.3.1 Reclamation Costs 10 <br /> 9.3.2 Special Materials Handling 12 <br /> 4.3.3 Compliance 12 <br />4.4 Post-Mining Land Use 13 <br />9.5 Mitigation of Coal Mining Operation Impact 14 <br /> 4.5.1 Air Pollution Control Plan 19 <br /> 9.5.2 Fish and Wildlife Plan 15 <br /> 4.5.3 Protection of the Hydrologic Balance 16 <br /> 9.5.3.1 Surface Water 16 <br /> 9.5.3.2 Ground Water 17 <br /> 9.5.9 Protection of Public Parks and Historic <br /> Places 18 <br /> 4.5.5 Subsidence Control Plan 18 <br />4.6 References 19 <br />NCIG - Load Out Revision <br />4-i <br />ABC/1145/910531 <br />6/s15~ <br />