Laserfiche WebLink
-III IIIIIIIIIIIII III <br />Mountain Coal Company <br />West Elk Mine <br />Post Office aoz 597 <br />Somerset, Colorsdo 81434 <br />Tek:phone 30.3929-5075 <br />Fax 303 9295595 <br />July 28, 1994 <br />Ms. Christine E. Johnston <br />DMSION OF MINERALS AND GEOLOGY <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECEIVFI^ <br />AUG G -, 1994 <br />Divslon of nvnerais a Geology <br />Re: West Elk Mine, Permit No. C-80-007, Power Pole Realignment <br />Dear Christine: <br />/\ <br />As you know, five to six power poles are presently located in the area of the proposed materials <br />storage bench (per TR 67). Mountain Coal Company (MCC) would like to relocate these poles <br />along the existing light-use road located to the south of this area prior to the start of the bench <br />construction and prior to the next longwall move (scheduled within two weeks and requires full- <br />time ventilation, i.e. the fan cannot be shut down to move the power line). No new disturbance is <br />anticipated other than brush-crushing the western-most line corridor (a dozer width for about <br />300') from the east portal retaining wall to the existing light-use road to the southeast, in order to <br />string the line, and azound the poles which require guy-wires. <br />Please advise MCC as to whether or not a revision is required to proceed with this work. Contact <br />me should you have questions. <br />Sincerely, <br />~'~ ~~.~- <br />Kathleen G. Welt, <br />Environmental Supervisor <br />