My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90521
DRMS
>
Back File Migration
>
Revision
>
REV90521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:13 AM
Creation date
11/21/2007 11:03:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Revision
Doc Date
2/5/2002
Doc Name
ADEQUACY REVIEW MR19 HAUL ROAD GUARDRAIL TERROR CREEK LOADOUT C-83-059 TERROR CREEK CO
From
DMG
To
OXBOW MINING INC
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiiiiii- <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (307) 866-3567 <br />FAX: (303)832-8106 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Februazy 5, 2002 Bill Owens <br /> Governor <br /> Greg E. Walther <br /> Executive Director <br />Kathleen Welt Michael B. Long <br />Oxbow Mining, II1C. Division Director <br />P.O. Box 535 <br />Somerset, Colorado 81434 <br />Re: Adequacy Review, MR-19, Haul Road Guazdrail, Terror Creek Loadout, Permit No. C- <br />83-059, Terror Creek Company <br />Dear Ms. Welt: <br />The Division has completed its adequacy review of Terror Creek Company's (TCC) submittal <br />dated January 21, 2002 for MR-19 for the Terror Creek Loadout. Please note that the Division's <br />records show that this revision is MR-19, not MR ?0. which was on TCC's submittal and on the <br />Division's completeness letter to TCC. The following are the Division's questions and <br />comments: <br />Reclamation Bond Liability <br />Attached is the reclamation cost estimate for MR-19. The estimate is comprised of two <br />tasks (a demolition task and a summazy task) and represents an increase in liability of <br />$9,758.00. Please review the reclamation cost estimate and inform the Division as to <br />whether TCC finds the estimate acceptable or unacceptable. <br />2. TCC's current liability is $237,526.00. With the approval of MR-19, the revised <br />reclanlation liability would increase by $9,758.00 to $247,284.00. However, the Division <br />holds an approved bond of $246,755.00, which would be deficient by $529.00 when MR- <br />19 is approved. Please submit additional bond of $529.00 to cover [he increase <br />reclamation liability cost for MR-19. <br />Text and Maps <br />3. Please update the permit text in Section 2.05 of Volume 1 to state that the guardrail was <br />installed and that it will be removed upon reclamation. The haul road is described on <br />
The URL can be used to link to this page
Your browser does not support the video tag.