Laserfiche WebLink
• Coloradc III III III III IIII III I Geology <br />_______. 999 .________ <br />ESTIMATING FORM - BULLDOZER WORK <br />Task p: 2 Prep. by: AJW <br />____________ ________ <br />Dace: 05/19/9'1 Permit p:M-95-210 <br />____________ ________ <br />Permit Action: conversion <br />_________________ <br />Task Description: backf ill <br />HOURLY EQUIPMENT COST <br />_____________________ Basic Machine: Cat DSH SERIES II Hors epower: <br /> Blade Type: POWER ANGLE TILT - <br /> Attachment pl: ROPS Cab Shif t Basis: 1 <br /> Attachment p2: 3-shank upper - <br />Cost Breakdown: <br />-------------- Uti liza[ion k <br />Ownership cost/hr = $19.63 N/A <br />Opera sing fi overhaul cost/hr- tlozer = $20.38 95 <br /> -ripper = $0.09 S <br />Operator cost/hr = $22.95 N/A <br />Total egp[. unit coat/hr = $63.09 Total flee[ cost/hr: <br />MATERIAL ONANTITIES <br />Initial Swell Loose <br />Volume: 12,366.0 L CY Factor: N/A Volume: 12,366.0 <br />____________ <br />Source of quantity ta <br />ke-off: exhibit __________ ____ <br />d _________ <br /> <br />Source of est. swell ________ <br />fa cco r: na _________________________ __________ <br /> <br />HOURLY PRODUCTION ________ _________________________ __________ <br />••_______________ Job Condition Correction Factors <br />Avg. push distance: 200 ft. ------------------------ -------- <br />- -------- Operator.......... 1.00 <br />Unadj used hourly Mat. consistency.. O.BO <br />dozer production: 141 LCY/hr Dozing method..... 1.10 1 <br />- -------- Visibility........ 1.00 t <br />Material consistency: Job efficiency.... 0.87 <br />Rock, well ripped or blasted Spoil pile factor. 0.80 1 <br />_____________________ ________________ Push gradient..... 0.90 <br />Avg. push gradient: 5.00 } Ipoel Altitude dera Lion. 1.00 <br />- -------- Material weigh[... 0.70 <br />Avg. site altitude: 6000 Fc. Blade type........ 1.00 <br />Material weight 3300.00 16/LCY Net Job Correction 0.3"1 <br />Ma[. Desc r.: - -------- --- -------- <br />Decomposed rock - "IS} <br />____________________ Rock, 25} Earth <br />______ <br />_ Adjustetl Unit Prod.: 51. R4 L <br />_ __ <br />_______ <br />___ <br />Atlj usted Flee[ Production: ________ <br />51.84 L <br />SOB COST <br />Fleet size <br />Unit Cos[ <br />1 Dozer (57 Total Job Time: 238.56 <br />______ ___________ <br />$1.216 /LCY Total Job Cosc: $15,039.39 <br />Task File Name: M210-2 <br />Mine: Rocky Road Oua try <br />120 <br />$63.09 <br />I <br />tbl~ <br />sl) <br />-rf) <br />tb1l <br />tbl~ <br />tbl) <br />