My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV89068
DRMS
>
Back File Migration
>
Revision
>
REV89068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:11:03 AM
Creation date
11/21/2007 10:48:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/17/1994
Doc Name
COLOWYO COAL MINE C-81-019 TR 28
From
DMG
To
COLOWYO COAL CO LP
Type & Sequence
TR28
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DC{llrlnlCnl OI Ndl Urd Rc<UVrCe? <br />I { I'{ Sherman $L, Rnnin 11 S <br /> <br />Denver, Culuradu HDN)i I~ <br />I'hanc•. OpA Hbfi 3567 I <br /> <br /> 11EI'ARTMENT OF <br /> NATUIZA_I, <br />May 17, 1994 RESOURCES <br />James A. Kiger ; °; h';~ ;" <br />Colowyo Coal Company L. P. ~ <br />. <br />, <br />, <br /> <br />5731 State Highway 13 , <br />,, <br />,, <br />,,,,,, <br />I.,,,,~,,, I,,,~r~~~, <br />Meeker, Colorado 81641 ~~,Ii.i~I ll I„np <br /> <br />RE: Colowyo Coal Mine (C-81-019) <br />Technical Revision 28 <br />Dear Mr. Kiger: <br />We have completed our preliminary adequacy review of materials submitted in support of the <br />above mentioned technical revision application. With a few minor exceptions, the proposal is <br />acceptable. As we discussed earlier this morning, Colowyo needs to address the following <br />concerns prior to Division approval of the revision. <br />1. The reclamation cost estimate for reclaiming the drill access roads does not appear [o <br />include regrading costs. Please estimate the costs that would be incurred, and adjust the <br />liability figure accordingly. <br />2. The total additional bond amount, as stated in the Technical Revision 28 "Bond <br />Calculation Add-On" summary does not appear to include indirect costs. The current <br />percentage of indirect costs associated with the entire mine reclamation estimate is 17.29 <br />percent. Please include an additional ]7.29 percent of the total bond amount for indirect <br />costs. <br />3. We discussed the Division's concern with the location of [he drill hole access ro:lds in <br />relation to known areas of instability. You indicated that the roads would be above those <br />areas, and should not cause concern. No further response on this matter is necesstlry. <br />Should you or your staff have questions or need additional information regarding these concerns, <br />please contact me. <br />Sincerely, <br />/L~ ' <br />Susan L Burgt ier <br />Environmental Protection Specialist <br />SLB\051794. W P <br />
The URL can be used to link to this page
Your browser does not support the video tag.