Laserfiche WebLink
• III Illllllllllllllll <br /> <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenr of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: 13071 8663567 <br />FAX: (3031832-8106 <br />August 3, 1994 <br />Mr. William J. Almas <br />Energy Fuels Nuclear Inc. <br />1200 17th St. Ste. 2500 <br />Denver, CO 80202 <br />Re: Topaz Mine, Succession Approval, Permit No. M-80-OSSHR, Revision No. <br />SO-002 <br />Dear Mr. Almas: <br />On August 3, 1994 the Colorado Mined Land Reclamation Board approved the <br />succession of operators from Umetco Minerals Corporation to Energy Fuels <br />Nuclear Inc. for this operation. Energy Fuels Nuclear Inc. is now the <br />permitted operator of the Topaz Mine, and as such, is responsible for all <br />provisions in Permit No. M-80-055HR, as well as those specified in the <br />Minerals Rules and Regulations. Umetco Minerals Corporation is relieved of <br />all responsibilities concerning this operation (See Mineral Rules and <br />Regulations Number 1.12). <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lochhead <br />Evecwive Direcbr <br />Michael B. Long <br />Division Duecror <br />The Division would like to remind you, as the permitted operator, about a few <br />things we feel are important: <br />1. All of the application materials, as amended and supplemented, are an <br />integral part of your permit. They have been incorporated into the permit by <br />reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you <br />keep a copy of the permit and the permit application at the mining operation <br />as a reference for operating personnel, to help ensure compliance with the <br />terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Mineral Rules and Regulations and/or contacting us to determine <br />if a revision to the permit is necessary. Rule 1.8 pertains to Amendments, <br />Rule 1.10 to Technical Revisions, and Rule l.ll to Conversions. <br />