My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88880
DRMS
>
Back File Migration
>
Revision
>
REV88880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:55 AM
Creation date
11/21/2007 10:46:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Revision
Doc Date
5/7/1993
Doc Name
BENCH SLUMP NOV 93-033 PN C-81-047
From
MINREC INC
To
DMG
Type & Sequence
MR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINREC, INC. <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FA 242-7908 <br />May 5, 1993 <br />BLUE RIBBON MINE <br />iiiiiiiiiiiiiiiiii <br />C. E. Johnston <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bench Slump <br />NOV. 93-033 <br />Permit C-81-047 <br />Dear Ms. Johnston: <br />The subject NOV required <br />impact of the slump/slid <br />water is eroding some of <br />on the topsoil below the <br />immediately below the ar <br />the intermediate bench. <br />intercepts all the run-of <br />RECEIVcp <br />MAY 0 ~ 199 <br />Division of Mure~3ls a ~eolo9Y <br />an interim abatement step to contain the <br />e to as small an area as possible. Rain <br />the exposed coal waste and depositing it <br />slide. MINREC will install a silt fence <br />ea where the slump/slide is deposited on <br />The silt fence will be installed so it <br />f from the slump/slide area. <br />Since showing the silt fence on a map would be difficult, I hope <br />this verbal description will suffice. The silt fence will be field <br />located to accomplish the stated goal of isolating the impact of <br />the slump/slide. The silt fence will be installed no later than <br />May 21st. <br />Please call if you have any questions. <br />Sincerely, <br />S~ <br />Jim Stover, P.E. <br />Chief Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.