My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88859
DRMS
>
Back File Migration
>
Revision
>
REV88859
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:54 AM
Creation date
11/21/2007 10:46:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
Revised Page Letter
From
Peak Project Management
To
DMG
Type & Sequence
TR55
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peak Project Management, LLC <br />34115 County Road 20.8 <br />Trinidad, CO 81082 <br />Telephone/Fax: (719) 846-4975 <br />Cell: (719) 859-0111 <br />e-mail: ronthompsort~sensonics,org <br />February 10, 2004 <br />Mr. David Beny <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />~~~~~~~® <br />FEB 1 't 2004 <br />Division of Mii erals and Geolon" <br />Re: Golden Eagle Mine Permit No 81-013 <br />Dear Mr. Berry: <br />Basin has reviewed the issues addressed by the Division' adequacy letter regarding Technical Revision 55 <br />to the Golden Eagle permit. In response to this review, Basin is submitting the enclosed revisions and <br />additions to the original submittal: <br />Page v Added additional figures to List of Figures in Table of Contents <br />Page 2.05-27 Changed text in section g). <br />Page 2.05-27A Repaginated Figure 4 <br />Page 2.05-278 Repaginated Figure 5 <br />Page 2.05-28 Added Figure 7 -Northwest Airshaft Abandonment Project <br />Page 2.05-28A Repaginated Figure 8 (Originally submitted as Figure 7 on December 10, 2003) <br />Page 2.05-29 Continued revision of text in section g). <br />Page 2.05-29A Added Figure 9 -Northwest Airshaft Posi Mining Topography <br />Page 2.05-30 Repaginated existing text. <br />Exhibit 19-9 Bonding Schedule for TR-55 <br />1 have enclosed three copies of each item. Please contact me if there are any questions or items that need <br />clarification. <br />Si~ely, <br />D+1 <br />Ron Thompson <br />
The URL can be used to link to this page
Your browser does not support the video tag.