My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88511
DRMS
>
Back File Migration
>
Revision
>
REV88511
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:38 AM
Creation date
11/21/2007 10:42:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976032
IBM Index Class Name
Revision
Doc Date
6/15/1994
Doc Name
ADEQUACY REVIEW ALEXANDER PIT TR 003 PN M 76-032
From
DMG
To
TELLURIDE GRAVEL INC
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III IIIIIIIIIIIII III ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: 13031 866-3567 <br />FAX:1303)872-8106 <br />March 15, 1994 <br />Mr. Gary Whitfield <br />Telluride Gravel, Inc. <br />P.0. Box 445 <br />Telluride, Colorado 81435 <br />„c ~ <br />~d ~ C <br />~~• <br />revs <br />Rq Romer <br />Governor <br />Michael 8. long <br />Division Director <br />RE: Adequacy Review - Alexander Pit Technical Revision No. TR003 <br />Permit No. M-76-032 <br />Dear Mr. Whitfield: <br />The Division has reviewed your request for a technical revision to <br />your reclamation permit to replace an existing 12'# 60'office <br />trailer with a 24'# 60' double wide trailer. Enclosed is a bond <br />calculation for costs associated with removing the trailer under a <br />bond forfeiture scenario where the Division would have to hire an <br />independent contractor to complete reclamation of the site at the <br />point of maximum disturbance allowed by the permit. The attached <br />costs are for the removal of this trailer only. Bond amounts <br />calculated previously for the remainder of site reclamation are in <br />addition to the costs calculated for this revision. <br />If Telluride Gravel needs to expedite the approval of this <br />revision, please submit the required bond monies and associated <br />bond forms to Debbie Mulloy at our Denver office in an acceptable <br />type of bond as soon as possible. Installation of the facility <br />must not begin until the bond has been accepted by the Division. <br />If Telluride Gravel has already submitted an acceptable bond in an <br />amount sufficient to cover the cost of both technical revision no. <br />TR002 (waste oil containment facility) and this revision, then <br />installation may proceed. The total bond cost for both TR002 and <br />TR003 is $ 9,476.00. Please call me at the Durango Field Office, <br />1474 Main Ave., Room 223, Durango CO, ph. 303-247-5062 if you have <br />any questions or comments. <br />Sincerely, <br />Tom Gillis <br />Environmental Protection Specialist <br />/tdg <br />Enclosure(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.