My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88299
DRMS
>
Back File Migration
>
Revision
>
REV88299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:29 AM
Creation date
11/21/2007 10:41:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991035
IBM Index Class Name
Revision
Doc Date
3/13/1996
Doc Name
REQUEST FOR TR PN M-91-035 AM-001 WESTERN AGGREGATES INC JEFFERSON CNTY COLO
From
AGRA EARTH & ENVIRONMENTAL
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1,6oloan st sietau~~~~ .o voi<:~ II I I II I II I II IIII III <br />~AG RA <br />Earth & Environmental <br />March 12, 1996 <br />Mr. Carl Mount <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver CO 80203 <br />9661 5 l HHW <br />4~/\I~:l~t1 <br />AGRA Earth & <br />Environmental, Inc. <br />17301 W. Colfax Avenue <br />Suite 170 <br />Golden, Colorado 80401 <br />Tel (303) 277-9988 <br />Fax (303) 277-9955 <br />AEE Project No.: 6-317-0006 <br />1-'fz-~ <br />SUBJECT: Request for Technical Revision -Permit No. M-91-035 AM-001 <br />Western Aggregates Inc. -Jefferson County, Colorado <br />Dear Carl: <br />This lettfar and accompanying map (as well as the S150.00 application fee) is a request for <br />a Technical Revision (TR) to the above referenced permit. The mine is referred to as the <br />Bluestone Expansion. <br />The Division conditionally approved the permit on April 26, 1995. The financial warranty was <br />set at 5428,307.00 for 80 acres of disturbance (or S5,354 per acrel. Western Aggregates, <br />Inc. (WAl) has no dispute with this bond calculation. <br />The Jefferson County Commissioners approved mining on only 22.8 acres of the Bluestone <br />Expansion. All the remaining acreage (101.2 acres) is subject to moratoriums of at least five <br />(5) years for a variety of reasons. <br />WAI does not want to bond for 80 acres when they can only mine 22.8 acres in the <br />foreseeable future. Thus the TR to reduce the bond amount. <br />The only activity proposed on the expansion area is mining, reclamation end transport of pit <br />run materials back to the permanent processing plant, which is located on the originally <br />permitted land (Permit No. M-91-035). The bond calculation on the expansion area was based <br />on grading and shaping, topsoiling, seeding and mulching. There was no amount calculated <br />for processing plant removal. <br />The attached map shows the 22.8 acres that WAI wished to bond (identified as Phases 2A <br />and 3A). We believe it is acceptable to apply the 55,354 per acre figure to that acreage for <br />a total rnaw bond of 5122,071.00. Please let me know if you have any questions or need <br />addition>:d information. <br />Sincerely, <br />A A EARTH & ENVIRONMENTAL, INC. <br />~~~~ <br />Paul Banks <br />Senior Project Manager <br />Attachment <br />cc: Niartin Jones -WAI <br />Engineering 8 Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.