My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-10_REVISION - M1997054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997054
>
2007-10-10_REVISION - M1997054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:16 PM
Creation date
11/21/2007 10:30:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
Revision
Doc Date
10/10/2007
Doc Name
Response
From
OSE
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~SL~ SPATE OF COLD ADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources ~~ / <br />Department of Natural Resources K/ / l „ _ <br />7313 Sherman Street, Room:818 / /J~/ <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />http:/hvww.water. state.w. us <br />RECEIVED <br />OCT 1 0 2007 <br />/,~ Divislol~ ~~ neaamation, <br />(T7v1 Mining and Safety <br />c <br />i :, <br />N~~? <br />•iai ' <br />Bill Ritter, Jr. <br />Governor <br />Res onse to Reclamation Permit A lication Consideration Hama D. Sherman <br />P PP ExecuGVe DireMOr <br />DATE: October 10, 2007 (vecanr) <br />filets Engineer <br />TO: Berhan M. Keffelew, Senior Environmental Protection Specialist <br />CC: Division 2 Office; District 12 Water Commissioner <br />FROM: Clay Kimmi, P.E. ~ <br />RE: Parkdale Project Pit, File No. M-97-0`54 <br />Operator: Front Range Aggregates, LLC <br />Contact: Tom Maul, (719) 884-8000 <br />Section 12, Twp 18S, Rng 72W, 6th P.M., Fremont County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area, The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: Well permit number 61852-F has been issued for this pit. The well permit was issued <br />pursuant to a substitute water supply plan which is valid through September 30, 2008. <br />COMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.