Laserfiche WebLink
<br /> ly~~.~D2Z ~ <br /> ~t~'7(3( ~(3-S,[t=r <br /> STATE OF COLORADO <br />DIVISION OF h11NERALS AND GEOLOGY <br />f <br />Department o <br />Natural Resources R EC E l V E D <br />1313 Sherman St., Room ?t 3 <br />Denver, Colorado 80?03 D I v I s I O N [ <br /> <br />Phone: (3031 866.3567 ~ <br />t~ 1 hl 1: RA I <br />APR 2 9 2002 <br />fAX: 13031 83?•8106 &-'-' <br /> Division of Minerals and Deology G E O L O G <br /> 0.EY LAMATIO <br />Mf NING•$AFET <br />TRANSFER OF PERI4IIT AND SUCCESSION OF OPERATORS '~ gal owes <br /> APPLICATION FORb! covertwr <br /> Creg E. W alcher <br /> Enecutipe Dtreaor <br /> Michael g, long <br /> • Division Director <br />The application for a Transfer of Permit and Succession of Operators must contain four (4) major parts: 1) an Application <br />Form; 2) an Application Fee; 3) a Performance Warranty (attached as part of the Application Package) bearing the original <br />notarized signature of the Successor Operator, and, 4) a replacement Financial Warranty provided by the Successor <br />Operator, bearing an original notarized signature. To expedite processing, please provide the information in the format <br />and order described below. <br />FINANCIAL WARRANTY INFORMATLON (Choose ONE Option): <br />1. Option A: <br />(Initial & Date) <br />I wish to WANE MY RIGHT to a 30-day processing time to allow <br />the Division of Minerals and Geo]ogy to recalculate the Financial <br />Warranty requirements. Ifyou choose Option A you should ~ submit <br />a Financial Warranty and Performance Warranty until the Diroision <br />notifies you of the coaect amount of your warranty requirements. <br />2. • n B: iZ6J ~I-12-UZ <br />(Initial & Date) <br />I DO NOT WISH TO WANE MY RIGHT to a 30-day processing <br />time. I hereby submit a replacement Financial Warranty for the same <br />dollaz amount as the Financial Warranty maintained by the current <br />operator. I understand that the Division of Minerals and Geologr• will <br />recalculate the required reclamation bond within 60-days from the date <br />that the transfer is completed and the required FINANCIAL <br />WARRANTY COULD BE SUBSTANTLALLY INCREASED at that <br />time. As the new operator,- I ogee to be responsible for posting any <br />required increase to the financial tvaaanty for good cause shown; in a <br />form acceptable to the Eoard, within 60-days of such notice. <br />