Laserfiche WebLink
m37s ei~war v- <br />w..ar.a r.~t, eo > <br />TdepM~ (71!) f1s73171 <br />Fay (7lFj i89-31St <br />~kiz-c~o~ <br />7 FZ~ <br />Date: 2/6!06 <br />To: The Division of Minerals & Geology <br />From: Gillette Sand & Gravel Inc. <br />Re: Technical Revision for Mine Road Detour <br />Attn: Berhan Keffelew <br />Deaz Berhan, <br />RECElVE® <br />a o coos <br />Division of Minerals and Geology <br />As stated in the annual report for 2005, an azea of disturbance to the South of the <br />current Road Base excavation is anticipated and will need to have an <br />accompanying road detour of approximately 650 R This road will be temporary, <br />16 ft wide and have adequate ditches on either side to accommodate all <br />precipitation nmoffevents for that localized area. <br />This detour will allow access to neazly 1.5 acres of new Road Base material and <br />will be reclaimed and restored in accordance with the approved Reclamation Plan . <br />when mining in [hat area is concluded. At that point, swell-graded road with <br />accompanying ditches will be replaced along neazly the same map view as the one <br />is currentiy. <br />The area of surface disturbance at this time is measured at neazly 8.3 acres and <br />with the addition of l .5 acres of new disturbance; the total disturbed area will still <br />exist well within the 10 acres currently bonded. <br />Thank you for your proarpt attention on this matter. <br />ISilnPcerely <br />" P ~' <br />Chris Pyles <br />