My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-04-05_REVISION - M1991074
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991074
>
2006-04-05_REVISION - M1991074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:05 PM
Creation date
11/21/2007 9:48:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991074
IBM Index Class Name
Revision
Doc Date
4/5/2006
Doc Name
Response
From
OSE
To
DMG
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5~ <br />~mr h6 h ~/1'/~ Z-- <br />OF COLORADO <br />OFFICE OF THE STATE ENGINEER _ "' of co~~ <br />Division of Water Resources ~R 0 5 2006 ° " <br />Department of Natural Resources h <br />r ~ a <br />1313 Sherman Street, Room 818 Division of Minerals and Geology ~ <br />Denver, Colorado 80203 " rage ~` <br />Phone (303) 866-3581 <br />FAX (303) 666-3589 <br />Bill Ovens <br />www.waterstate.co.us governor <br />Response to Reclamation Permit Application Consideration Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />DATE: April 5, 2006 ' <br />TO: Christopher M. Rowe, Environmental Protection Specialist <br />CC: Division 2 Office; Dis 'ct 67 Water Commissioner <br />FROM: Don West, P.E. <br />RE: Barnett Pit, File No. M-1991-074 <br />Operator: Kiowa County <br />Contact: Debra Immer 719/438-5810 <br />Section 33, Twp 185, Rng 49W, 6th P.M., Kiowa County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of alt wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the pertnit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.