My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-06-13_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1994-06-13_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 1:53:58 PM
Creation date
11/21/2007 9:46:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
6/13/1994
Doc Name
SAN LUIS THIRD PARTY TECHNICAL OVERSIGHT
From
WATER WASTE LAND
To
BATTLE MOUNTAIN RESOURCES INC
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e ~~~ II <br />~~ <br />June 9. 1994 <br />WAR <br />WASTE <br />& LAND <br />wG <br />Battle Mountain Resources,lnc. <br />P.O. Box 310 <br />San Luis, Colorado 8 1 1 5 2-031 0 <br />2629 Redwing Rd. Suite 200, Collins, Colorado 80526-2879 <br />(303)226-3535 <br />f.ex (303) 226-6475 <br />~r--`;,, ~,~, <br />_;, <br />JUN i 3 j994 <br />~e •~, <br />'• .rrp ,::,re;, WWL /1390 <br />u5 c! LBC;r.~% <br />Attention: Alana L. Scott, Environmental Engineer <br />Subject: San Luis, Third-Party Technical Oversight <br />Dear Alana, <br />Attached is WWL's invoice for work conducted on the San Luis project from Fehruary 1 <br />through May 31, 1994. This is the fourth invoice to Battle Mountain Resources, nc. (BMRI) <br />under the October 15 Agreement for Third Party Oversight and Review conducted under the <br />direction of the Division of Minerals and Geology iDMG1. <br />This invoice totals 52223.61 and consists of work conducted under Task 5 of Exhibit A of <br />the October 15 Agreement. All of the Exhibit A tasks are listed below and are referred by <br />task number in the tables that tollow. <br />Task Description <br />1 Familiarization with Approved Plan <br />2 Field Construction Oversight <br />3 Oversight of Field Testing Program <br />4 Review of Related Technical Submittals <br />5 Review of Fnal Construction Certifications <br />6 Participation in Meetings <br />The professional time and expenses outlined in this invoice have been separated by task. <br />Discussion of work progress and anticipated expenditures have also been separated by task, <br />as stipulated in Articles 3.2 and 3.3 of the October 15 Agreement. These items are outlined <br />below. <br />EXPENDITURES TO DATE -PROFESSIONAL TIME <br />Professional time on the project for the period listed above totals 52,207.25. Allocation of <br />professional time by personnel and task is summarized in the table below. Actual weekly time <br />sheets with task allocations are included with our invoice. <br />Consulting Engineers and Scientists <br />
The URL can be used to link to this page
Your browser does not support the video tag.