My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-06_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2007-06-06_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:11 PM
Creation date
11/21/2007 9:23:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
Revision
Doc Date
6/6/2007
Doc Name
Response to Reclamation Permit Application Consideration
From
OSE
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303)866-3581 <br />FAX (303) 866.3589 <br />STATE OF COLORADO <br />RECEIVED <br />~1N 0 6 2~u! <br />f ~ Division or hceaamation, <br />Mining and Safety <br />htlp://www.waterSUte.co.us <br />Response to Reclamation Pet~rrtit Application Consideration <br />DATE: June 6, 2007 <br />TO: Erica S. Crosby, Environmental Protection Specialist <br />CC: Division 1 Office, District 3 Water Commissioner <br />FROM: loans Comaniciu, E.I. ~ <br />RE: Brownstone Quarry, File No. M-1997-065 <br />Operator: Stone Wholesale Corporation <br />Contact: Jim Striggow - (970)-221-1832 <br />Section 24, Twp 8 North, Rng 70 West, 6th P.M., Larimer County <br />CONDITIONS FOR APPROVAL <br />pF'CO <br />h~ ~ <br />Ne, a <br />'.r~;:0 <br />v rar <br />Bill Ritter, Jr. <br />Covemar <br />Hams D. Sherman <br />Executive Oirectar <br />® The application is submitted for a conversion from an existing 110 gravel pit to a 112 gravel pit. The <br />proposed operation as indicated in the original 110 permit does not anticipate exposing groundwater. <br />Therefore, exposure of ground water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^reclamation, <br />^water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />^ The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, or the water was diverted in priority under a water right decreed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise, the operator will need to make replacements for evaporation. <br />The applicant may contact the State Engineer's Office with any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.