My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-09-08_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-09-08_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 5:20:53 AM
Creation date
11/21/2007 9:19:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
9/8/1992
Doc Name
SAN LUIS PROJECT MLRD FILE M-88-112
From
BATTLE MTN GOLD CO
To
MLRD
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sip o s ~ss~ <br />BATTLE MOUNTAIN GOLD COMPANY ~~, <br />UIINf:RF,~S c ~~E.; , <br />September 4, 1992 <br />GO~LDE COMP~NJVN <br />Dr. James A. Pendleton <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80202 <br />RE: SAN LUIS PROJECT, MLRD FILE NO. M-88-112 <br />Dear Jim: <br />During an early July 1992 telephone conversation, Andre <br />Douchane indicated that Battle Mountain Gold Company had completed <br />another engineering estimate of the volume of water in the San Luis <br />tailings impoundment. That amount was approximately 77. acre feet, <br />plus or minus 15 percent. Since that time water has been added to <br />the impoundment through pit dewatering activities and intense <br />summer thunderstorms. Water has also been consumed in the milling <br />process and through enhanced evaporation. BMG believes that the <br />recently acquired site specific information should be used to <br />update the water balance model for the operation. BMG is currently <br />developing information on the exact tailings and water levels, the <br />as-constructed tailings impoundment stage-storage volumes, and <br />measured precipitation and pit dewatering volumes. This informa- <br />tion will be utilized to update the water balance model for the <br />project based on as-constructed and as-operated site specific data. <br />Once the updated model is completed, it can then bey used as a <br />verification of the site water balance by site personnel on a <br />routine basis. <br />We believe that this updating process will take ap~{proximately <br />three weeks. Once we have completed the update, we wlill provide <br />the Division with the updated information. <br />If you have any questions about this matter, please contact <br />me. <br />Sincerely, <br />Anne C. Baldrige <br />Manager of Environmental Affairs <br />cc: K. Kluksdahl, BMG <br />920902A <br />5670 GREENWOOD PLAZA BLVD. SUIIE 106 ENGLEWOOD, C0 80111 (3031721 b744 FA%(303) 721fi813 <br />
The URL can be used to link to this page
Your browser does not support the video tag.