Laserfiche WebLink
~ III IIIIIIIIIIIIIIII • <br />BATTLE MOUNTAIN RESOURCES, INC. . <br />wl <br />c;~~~t <br />November 4, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology ioc~~,wANv <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luiis <br />DMG Permit No. M-88-112, TR-08 <br />well Installation Progress Report <br />Dear Mr. Oehler: <br />This letter is written to update the Division on the well <br />installations as required by the approved TR-08. <br />The construction of two additional groundwater monitoiring <br />wells (items 2 and 4) was completed on October 30, 19193. <br />TR-O8, item 2 required the installation of a well between <br />the collection pond and the toe of the main embankmenft. <br />This well has been identified as M-14. Geological arud <br />geophysical loggings have been conducted. In additian, <br />water samples (TR-06, Table 1 parameter list) have been <br />collected and shipped to Core Labs for analysis. <br />TR-08, item 4 required the installation of a replace>ent <br />well for M-13. The replacement well has been identified as <br />M-13R. The drilled location is approximately 30 feet east <br />of the existing M-13. Geological logging has been <br />completed, and water samples (TR-06, Table 1 parameter list) <br />have been collected and shipped to Core Labs for analysis. <br />As required by TR-O8, a final construction and compl tion <br />report will be submitted to the Division within 30 d ys <br />of well installation; the report will be submitted b <br />November 29, 1993. <br />Sincerely, <br />~~4 a s~- <br />Alana L. Scott <br />Environmental Engineer <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />A SUOSIDIARY OF RATTLE .NOUNTAhV FOLD COMPANY <br />P.O. BOX 310 SAN LUIS, COLONADO 81192.0310 (719) 672-336'_ FAX (719) 6T_-J3fi3 <br />