My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-06-12_REVISION - M1988112 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-06-12_REVISION - M1988112 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:20:24 PM
Creation date
11/21/2007 9:10:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
6/12/1992
Doc Name
APPROVAL OF TR-007-ADDITION OF HYDROGEN PEROXIDE TO TAILINGS PONDS-BATTLE MOUNTAIN GOLD CO-SAN LUIS
From
MLRD
To
BATTLE MOUNTAIN GOLD CO
Type & Sequence
TR7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I- III III~IIIIIIIII~II <br />999 <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />~ 313 Sherman SI., Room 215 <br />Denver, CO 80203 <br />303 666-3567 <br />Fnx~ 303 832.8106 <br />June 12, 1992 <br />Mr. Andre' Douchane, General Manager <br />North American Operations <br />Battle Mountain Gold Company <br />5670 Greenwood Plaza Blvd., Suite 106 <br />Englewood, CO 80111 <br />pF' Cpl <br />Nc ~~~ <br />. rlr ~ : <br />~. <br />'rave' <br />Roy Romer. <br />Gwamor <br />Michael B. Long, <br />DiNyon Director <br />RE: Approval of Technical Revision-007; Addition of Hydrogen <br />Peroxide to Tailings Ponds; Battle Mountain Gold Company; San <br />Luis Project; Permit No. M-88-112. <br />Dear Mr Douchane: <br />On June 12, 1992, the Colorado Mined Land Reclamatioh Division <br />conditionally approved the technical revision application cited <br />above with the following stipulation. <br />It is understood that the addition of hydrogen peroxide as a <br />treatment for lowering the weak acid dissociable cyanide and <br />copper concentrations is a temporary solution, to 'be applied <br />only until the INCO Sot/Air process is approved and installed. <br />The H2O2 system shall not be used after October 15, 1992, <br />without the express written permission from the Division. <br />The Division understands that the addition of HZ02 to the tailings <br />pond will lower the copper concentrations in the pond by <br />precipitating copper as various copper minerals in the tailings. <br />The Division understands that Battle Mountain has committed to <br />analyzing for copper in the pond solutions. The Division further <br />understands that samples from the tailings ponds will be collected <br />from at least six stations, each at two different levels, according <br />to methods described in the BEI pond characterization study. <br />If you have any questions, please contact me. <br />Sincerely, !, <br />H: Bruce Humphries ~ - - <br />Minerals Program Supervisor <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.