Laserfiche WebLink
~• <br />iii iiiiiiiiniiiiii • <br /> <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />Rnx~303 632~Bt06 <br />July 13, 1992 <br />STAT~OF COLORADO <br />pF Cpyp <br />R~~` \Q9o <br />~e'~ G <br />~~ ~?~ <br />1976 <br />Roy Ramer, <br />Gavemar <br />Micnael B Lang, <br />Drvis~on Director <br />Mr. Andre Douchane <br />Battle Mountain Resources Inc. <br />5670 Greenwood Plaza Blvd. Ste 106 <br />Englewood, CO 80111 <br />RE: Request for Information; Battle Mountain Gold; San Luis <br />Project; Permit No. M-88-112. <br />Dear Mr. Douchane: <br />As you know, the Board directed the Division to report at the July <br />Board meeting on its "beliefs" regarding BMRI's efforts to bring <br />down the cyanide levels in the tailings ponds. To accommodate <br />their directive I wish to request as complete a copy as you have of <br />all the pond samples from just prior to HzO: addition to the <br />present. <br />I understand from talking with you today that you have all of the <br />data on a spreadsheet, and that you may be able to print out the <br />data in graph form. At a minimum I could use the following: <br />1. All free, WAD and Total Cyanide data from each of the <br />several analytical labs. These should be segregated <br />according to the pond from which the samg~les were <br />collected. (If you are missing data from samples that <br />the Division collected, please let me know.) <br />2. A bar or line graph showing the trends for each of the <br />various labs' analyses. ZWhat we want to know here is <br />that Battle Mountain's internal monitoring. is at least <br />fairly consistent with external labs.) <br />3. An estimate of the amount of HZO, added daily to date, and <br />the approximate cost. (I doubt we will provide this data <br />to the Board unless asked.) <br />We hope to present data at least through Friday, July 17. More <br />would be useful, if possible. In either case, we will need the <br />information by mid-day, June 20. <br />