My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-08-31_REVISION - M1999021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999021
>
2004-08-31_REVISION - M1999021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:21 PM
Creation date
11/21/2007 8:38:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999021
IBM Index Class Name
Revision
Doc Date
8/31/2004
Doc Name
Adequacy Review
From
DMG
To
Aggregate Industries - WCR Inc
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />7313 Sherman St., Room 275 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />August 31, 2004 <br />Ms. Connie Nickle Davis <br />Aggregate Industries-WCR, Inc. <br />P.O. Box 337231 <br /> COLORADO <br /> DIVISION O F <br /> MINERALS <br /> <br /> <br />,r ,r <br />~ GEOLOGY <br />0.EC LAM ATION•MINING <br />~ <br />Ij/flyL SAf ETY•SCIENCE <br /> Bil) Owens <br /> Governor <br /> Russell George <br /> Executive Direcor <br />Greeley, CO 80633 <br />RE: Adequacy of the Technical Revision Request, Stegner Farms, <br />Permit No. M-1999-027, Technical Revision TR-004 <br />Dear Ms. Nickle Davis: <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The Division of Minerals and Geology (DMG) has completed a review of the above referenced technical revision <br />application and has determined that the following items remain to be addressed prior to approval. <br />1. Please provide specifications for the pipes to be used to construct the perimeter drain and the design basis for <br />the type of pipe selected. <br />2. Provide a design and specification for the pipe bedding to be installed and either provide a demonstration that <br />the bedding will have filter compatibility with the surrounding soil or commit to wrapping the perforated <br />sections of pipe with a geotextile filter fabric sock. <br />3. The DMG will require a demonstration that the perimeter drain, once completed, is functioning to adequately <br />stabilize ground water levels outside the slurry wall. Please commit to continued monitoring of existing wells <br />until such fime that the DMG determines that continued monitoring is no longer necessary, based on an <br />analyses of data and request to discontinue monitoring that will be prepared and submitted to DMG by <br />Aggregate Industries. <br />4. Provide a design and specification for the armoring to be installed in the proposed reservoir spillway and <br />describe the design basis for the sizing of the spillway and the riprap. <br />The 30-day time period for DMG review of the technical revision TR-004 application ends on September 1, 2004. <br />Please provide a letter at your eazliest convenience designating a new decision date for the technical revision <br />considering the time it will take to prepare responses to this letter and leaving at least 10 working days for the DMG to <br />review those responses (this date can always be changed later if you fmd you need more time). <br />If you have any questions, please contact me at 303-866-4063. <br />Sin el , ~~ <br />Allen C. Sorenson <br />Reclamation Specialist <br />cc: Carl Mount, DMG (via email) <br />Kate Pickford, DMG (via email) <br />c:~acs\IAANER MACHINE\[vey Documents~stegner tr4 adequacy.doc <br />Office of Office of Colorado <br />Minwi land Redamatinn Active and Inactive Mines Geoloeical Survev <br />
The URL can be used to link to this page
Your browser does not support the video tag.