Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Sheet, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAx (303) 866-3589 <br />www.watecstate.co.us <br />Response to Reclamation Permit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 1 Water Commissioner <br />FROM: Joanna Williams, Water Resource Engineer <br />DATE: April 24, 2002 <br />RE: Brighton Pit, File No. M-1977-436 (kd1A-(rd) <br />Section 23, Twp 1 S, Rng 67 W, 6th P.M., Adams County <br />Operator: Aggregate Industries- -WCR, Inc. <br />Contact: Aggregate Industries- -WCR, Inc. <br />3605 S. Teller St., <br />Lakewood, CO 80235 <br />303-985-1070 <br />/. oF' ~0~~ <br />yc vz:@~B 90` <br />n °' <br />. ~~ . <br />~~r rr <br />~~ t896 ~ ~ <br />bill Owens <br />Governor <br />Greg E Watcher <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, ^ <br />reclamation, ®water removed in the mined product, ^ processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: The gravel pit operation is currently coved under a Substitute Water Supply <br />Plan appoved by the State Engineer's office on October 31, 2001. <br />