My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-10-05_REVISION - M1984099 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984099
>
1998-10-05_REVISION - M1984099 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 1:53:46 PM
Creation date
11/21/2007 7:58:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984099
IBM Index Class Name
Revision
Doc Date
10/5/1998
Doc Name
BAILEY PIT 404 PERMIT ADAMS CNTY COLO
From
ENVIRONMENT INC
To
TECTONIC CONSTRUCTION CO
Type & Sequence
TR2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EpviropMelpt' I ]PC, <br /> LARRY E.O'BRIAN 7985 VANCE DRIVE, SUITE 205A <br /> FOUNDER ARVADA,COLORADO 80003 <br /> 303-423-7297 <br /> FAX 303-423-7599 <br /> September 17, 1998 <br /> Mr. Robert Lowdermilk RECEIVED <br /> Tectonic Construction CO. <br /> P.O. Box 385 <br /> Pinecliff, CO 80471 OCT 5 <br /> Dear Bob; DIV. OF MINERALS <br /> Ls <br /> GEOLOGY <br /> RE: Bailey Pit - 404 Permit <br /> Adams County Colorado <br /> I have completed the area and volume calculations for the <br /> sloping work you need to do along the St. Vrain River as required <br /> by the Army Corps of Engineers (ACOE) . To do this I used the <br /> measurements we did in July 1998 to create eight cross sections <br /> of the work areas. By using the average height of the bank and <br /> the length, I found calculated the amount of material that would <br /> have to be moved in each section so 3h to lv slopes could be <br /> created. The toe of each slope is 12 inches above the normal <br /> water line in the river. I then used the computer to determine <br /> what would be the best way to excavate a trench along the top of <br /> the existing bank so a cut/fill operation could then easily make <br /> the slopes . I found that if we make the width of the trench <br /> equal to the depth of the slope and the depth one-half the width <br /> the material left would be sufficient to create the 3h to lv <br /> slope. I also said we would use approximately 20 feet along the <br /> top of the slope where equipment would operate. <br /> Each numbered area on the map corresponds to a cross section <br /> and an area number in the tables. Table A shows the calculated <br /> volume of each trench using the numbers from the cross sections <br /> and the length from our measurements . Table B shows the amount <br /> of material left after excavation is done, and available to be <br /> used to create the 3h: ly slope. Table C shows the amount of area <br /> needing reclamation based on the recreated slope length and a 20 <br /> ft. wide work area on the tops of the finished slope. <br /> To recap my calculations I found that you would need to <br /> remove a total of 2, 317 cubic yards from 3, 030 feet of river <br /> bank. This will leave 2 , 482 cubic yards available to recreate <br /> the slopes as show on the cross sections . I would suggest you <br /> talk to Hall-Irwin about placing the excavated material on the <br /> setback area by the work area and blend it in with the top of the <br /> lake shore so it does not have to be hauled off for disposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.