Laserfiche WebLink
y~ ld.d5 FP.VM BMGL. 1 PHGE.90^c <br />• • III III III III IIII III • <br />999 <br />BATTLE MOUNTAIN NORTH AMERICA INC. <br />.4VDRE J. pOUCH4ivF. <br />rRCaiO.:.~. C hOrOtl~WNy <br />BY FACS LE MESSA E <br />June 22, 1992 <br />Dr. Jim Pendleton <br />Mined Land Reclamation Division <br />Dept. of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />SU$JECT: R E9I PBRIOD SSTSNSTON <br />Dear Dr. Pendleton: <br />In view of the complicated nature of the Technical Revision for <br />sampling protocol, I request an extension of the review period <br />from June 17 to July 6, 1992. <br />Sincerely, <br />Andrb J. Douchane <br />Vice President <br />Battle Mountain Resources Inc. <br />AJD:dsw <br />cc: Dean R. Massey <br />5679 GREE4 WOOD PLAZA BLVD. Sl%1'(E 106 E~VI.EWOOD. CV 50111 (303) 721~7m FAX (30}) 721fi513 <br />