Laserfiche WebLink
CLS~G~3M <br />I <br />I <br />I <br />`p ry^ L <br />I <br />I <br />I <br />~~ ~ <br />i <br />I <br />it <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER oe cow <br />Division of Water Resources iQ '~~ <br />Department of Natural Resources H <br />1313 Sherman Sveet, Room 818 x .~ <br />Denver, Cobrado so~G1~ lemental Res onse to Reclamation Permit A hcation Consideration "'e'6 <br />Phone (303) 866-358Y pp p Pp <br />FAX (303) 866-3589 Bill Owens <br />www.waterstate.co.us Governor <br />DATE: August 1, 2005 Russell George <br />Executive Director <br />TO: Kathleen L. Sullivan, Environmental Protection Specialist <br />CC: Division 5 Office; District 50 Water Commissioner <br />Hal D. Simpson, P.E. <br />State Engineer <br />FROM: Cynthia J. Love, Water Resource Engineer ~~~ <br />~ / ~ <br />RE: Operator: Grand Gravel, Grand Gravel Pit, File No. M-1998-019, Revision No. CN-1 <br />Sections 1 & 12, Twp 1N, Rng 80W, 6th P.M., Grand County <br />Landowner- Marilyn L. and Richard E. Curry <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will constmte ground water by ^evaporation, ^dust control, ^reclamatioa, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and doctunent the <br />locations of all wells within 600 feet mile of the pemut azea. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification hearing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for:uses at the permit site, storage in [he excavated <br />area(s). The applicant will need to provide evidence to this office that the water is pemlitted or decreed for such <br />uses. <br />^ Other: <br />COMMENTS: The applicant will use water from the Troublesome River for dust control at the permit site under free <br />river conditions. Water will be pumped from [he river when it is not on call, and stored in large tanks for later use as <br />necessary. The applicant will be required to curtail any undecreed diversions when a call is made on the river. The <br />applicant may wish to apply for a water right with the Division 5 Water Court if this operation will continue for several <br />years. <br />