My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-03-30_REVISION - M1978056 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2006-03-30_REVISION - M1978056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:30 PM
Creation date
11/21/2007 5:57:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
3/30/2006
Doc Name
Extension Request
From
Varra Companies Inc.
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR-30-06 91:27 PM VgRRq COMPgNI ES 970 353 4047 P. 02 <br />Mar 30 06 O1r01p VRRRR COMPRfiISS 3036666743 p.l <br />nHR"3B-o6 12:49 -M VRRRR COMPPN [ES 470 393 40gT P. 01 <br />Varna Companies, Inc. <br />r1301Y!!' Snit:! EtCdrtic~.ro ffi~IG td^pno~ rsmt nce~~s7. F~ nmr s6s~w <br />7huryday 30 Marsh 204 <br />Tltornas A. 5chrciner <br />Environmental Prvtectivn Specialist <br />Coiondo Division of Minerals atul Crentogy <br />Offce ofMined land Reclamation <br />1313 tihcrnratt Street, Room 115 <br />Denver, Colorado 60203 <br />Subject: DMG Permit MI978-0SG -Durham Sand Bt Gravel Pit Cl4ss: ~eu"iSieYt <br />f ethnical Revision 2 ~e-Seq. ~ T a <br />littcnsion Roqu~st. O <br />Dear Tan: <br />Conslslcn[ with your Conversattoa with Chris Pauley, Vats Companies, loc. is <br />requesting an cxlcnsion of the decision dale Crom 31 Much 20DC+ to 31 May 20t)G. <br />Varna Companies, inc. Is attempting to reply to all of [Ire concerns expressed by the <br />Division in its correslsondcnee of 21 February 2UU6, and will need additional tlrue <br />to cou~plete the following actions or information: <br />Stabitily Analysis: Our citi-il ottgincer has contacted several firms to bid and <br />pCrfunn drilling, core lab work and analysis. CGRS will conrmencc drilling rn <br />approxitnatety two weeks and should have :ulalysis near the etid of April We are <br />uneettain how' the results may impact final design, but it is uM anlicipatcd based <br />upon preliminary detetmtnations made ty CGRS <br />Design Hngineenng end the 11.5. Army Corps of L•'ngineer approval. Before the <br />U.S. Army Corps of lnrinccrs can Approve the plans, fhoy must first be tinali~ed <br />by the engineer and submillcd. Final plans are still bcioF drawn up by Anderson <br />Consulting Engineers, and discusacd with oorcivil engineer Once Submitted, <br />Atrdersat Coruulting Engineers atuieipates U.S. Amry Corps oCFngineers <br />approval could take uP to three weeks. We anticipate that submittal to uceta nv <br />later than the end of April, <br />Costs will be determined once the final plans arc drawn up. If final plans are <br />available Isy tIle end of April, there should be little dilFicuhy ut completiatg these <br />
The URL can be used to link to this page
Your browser does not support the video tag.