Laserfiche WebLink
STATE OF COLORADO <br />DIYIStON OF MINERALS AND GEOLOGY <br />Department d Natural Resources r <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303)866-3567 <br />FAX: (303)832-8106 <br />Febtnary 1, 2003 ~ <br />Mr. Steve Hankins <br />Hankins Stone Co., Inc. ~ <br />P.O. BOX 164 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Dove Creek, CO 81324 Ronald w. cottony <br />/ J Atting Division Director <br />Re: Hankins Stone Quarry #1, Permit No. M-2000-154, Succession Approval, Revision No. SO-1 f , <br />Deaz Mr. Hankins: <br />On January 28, 2003, the Division of Minerals and Geology approved the succession of operators from H& H <br />Stone Co, Inc. to Hankins Stone Co., Jnc. for this operation. Hankins Stone-Co.; Inc. is now the permitted <br />operator of the Hankins Stone Quarry #1, and as such, is responsible for all provisions in Permit No. M=2000-154, <br />as welt as those specified in the Rules and Regulations. H & H Stone Co., Inc. is relieved of all responsibilities <br />concerning this operation. <br />Please Note: <br />1. All of the application materials, as amended and supplemented, aze an integral part'af your:permit. They- <br />have been incorporated into the pemut by reference. We presume that you have a copy of all of these materials;. <br />therefore, none have been enclosed with this mailing. We suggest that you keep a-copy of the pemut and the <br />pernrit application at the mining operation as a reference for operating personnel, to help ensure compliance with <br />the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in [he permit may <br />require a modification to the permit. We suggest consulting the Rules and Regulations and/or contacting•us to <br />determine if a mod cation to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each yeaz, you must submit an annual fee and annual report to us. Please <br />consult the Rules, Act, and your permit for specific requirements. <br />If you have any questions, contact me. <br />Sincerely, ++ <br />l.~ <br />(~~, ~ .Posey <br />-I'fl Acting Senior Environmental Protection Specialist <br />cc: Fred Holley, H & H Stone Co„ Inc. <br />MdnsstSME1TEMPlM-SO-04 M2000154 SSS 20030201 713756 AM.doc <br />