Laserfiche WebLink
~~~~ <br />~s STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />http://www.water. state. co. us <br />~ba~ c~~ <br />pF' COQ <br />~" 'Pr <br />>. Wig, <br />Y X896 <br />Response to Reclamation Permit Application Consideration <br />Bill Ritter, Jr. <br />Governor <br />Hanis D. Sherman <br />Executive Director <br />(Vacant) <br />Slate Engineer <br />TO: David A. Bird, Environmental Protection Specialist <br />CC: Division 1 Office <br />FROM: Joanna Williams, Water Resource Engineer <br />DATE: September 14, 2007 ~ <br />RE: NCCI Pit #1, File No. M-2001-107 <br />Section 24, Twp 2 North, Rng 67 West, 6th P.M., Weld <br />Operator: Northern Colorado Constructors, Inc. <br />Contact: Northern Colorado Constructors, Inc. <br />9075 WCR 10 <br />Ft. Lupton, CO 80621 <br />RECEIVED <br />seP 1 ~ 200 <br />Division of fZeclamation, <br />Mining and Safety <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure <br />of ground water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, <br />^ reclamation, ®water removed in the mined product, ^ processing, ^ other. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site <br />and document the locations of all wells within 600 feet of the permit area. The applicant <br />must then obtain a waiver of objection from all well owners with wells within 600 feet of the <br />permit area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: The Applicant has obtained a substitute water supply plan ("SWSP") that is <br />currently valid through December 31, 2007. The Applicant has also obtained a well permit <br />for the uses allowed in the current SWSP. According to the Application the new area will <br />not be mined until after December 31, 2007. Therefore, the SWSP renewal must cover all <br />depletions that will result from the expanded operation. If the consumptive use at the site <br />exceed the consumptive use allowed under the existing well permit, a new well permit <br />must be obtained. <br />RECEIVED <br />`5€P 14 2007 <br />Division of Reclamation, <br />Mining and Safety <br />