Laserfiche WebLink
~~~ l <br />- .~ 4 ~S ~ STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER // <br />Division of Water Resources ~~~' n /~~ oc~co <br />Department of Natural Resources ~ l/K/ F``.- <br />1313 Shertnan Street, Room 818 ~.~. <br />Denver, Colorado 80203 'Isis <br />Phone (303)866-3581 <br />FAX (303)866-3589 <br />htlplAVww. Watecstate.co.us ~ Bill Riaer, Jr. <br />Governor <br />Rr esponse to Reclamation Permit Application Consideration Hams D. shennan <br />~ Executlve Director <br />(Vacant) <br />DATE: July 24, 2007 state engineer <br />TO: Thomas A Schreiner, Environmental Protection Specialist <br />CC: Division 2 Office; District 11 Water Commissioner <br />FROM: Clay Kimmi, P.E. /RECEIVED <br />RE: Half Moon Pit, File No. M-77-071 JIJ~'2 4 <br />Operator: Lake County, Z~O~ <br />Contact: Kenneth Olsen, County Administrator, (719)486-0093 ~ Uivlston ur nectamation, <br />Section 7, Twp 10 South, Rng 80 West, 6th P.M., Lake County Mining and Safety <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: See comments below. <br />COMMENTS: If stormwater runoff is intercepted by this operation or after reclamation, and it is not <br />diverted or captured in priority, it must be released to the stream system within three days. This may require <br />a discharge permit from CDPHE-WQCD. Otherwise the operator will need to make replacements for <br />evaporation. <br />The applicant indicated the operation would use water for asphalt batch plant operations from Parkville <br />Water District. The applicant will need to ensure that the operation obtains this water from a properly <br />decreed source for such industrial uses. <br />The applicant may contact the State Engineer's Office with any questions. <br />