Laserfiche WebLink
<br />T <br />III III'IIIIIIIIIIII <br />PARCEL, .MAURO, HULTl'N & SPAANSTRA, P. C. <br />4TTORNEYS AT LAW <br />SUITE 3fi00 <br />IBOI CALIFORNIA STREET <br />DENVER, COLORADO 80202-26JB <br />TELEPHONE (3031 292-6400 <br />TELECOPIEP 1303) 295-3040 <br />May 29, 1992 <br />VIA MESSENGER <br />Dr. James A. Pendleton <br />Technical and Scientific Coordinator <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />DIRECT DIAL <br />(3037 293-6516 <br /> <br />IAN ~ ~ 199 <br />Minep Land <br />Reclamation D~~^~r.,n <br />Re: Battle Mountain Resources ("BMR") -San Luis Project <br />Permit No. M-88-112 <br />Technical Revision No. 008 (Fee enclosed) <br />Proposed Ground Water Monitoring Plan Modifications <br />Dear Dr. Pendleton: <br />Enclosed with this letter you will find three copies of the above-referehced technical <br />revision for your review. This technical revision is submitted incompliance with Abatement <br />Requirement No. 6 which was imposed in conjunction with the recent enforcement action <br />taken by your office at the San Luis facility. Abatement Requirement No. 6 directs BMR <br />to "reevaluate its approved program for ground water monitoring, sampling apd analysis for <br />the tailings disposal area." The enclosed plan proposes the installation of two additional <br />ground water monitoring wells that can be used for both water quality monitoring and <br />remediation should any contamination be observed in local ground water. $MR believes <br />that the enclosed proposal to modify the ground water monitoring plan for the San Luis <br />facility meets all the requirements set forth in Abatement Requirement No. 6 and intends <br />to commence the procedures set forth in the proposal upon receipt of approval from your <br />office. <br />MARK N. SEM EN OFF <br />