Laserfiche WebLink
~: ~ ~ III IIIIIIIIIIIII III ~' <br />~~;~~~g STATF, OF COL ~~ IZADO <br /> <br /> <br />Roy Romer, Gove <br />DEPARTMENT OFNATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Director <br />October 18, 1989 <br />f~ r <br />Mr. Gary Dodson <br />Battle Mountain Gold Company <br />P.O. Box 310 <br />San Luis, Colorado 81152 <br />RE: San Luis Project, Technical Revision No. 3, File No. M-88-112 <br />Dear Mr. Dodson: <br />We have reviewed your technical revision request of September 26, 1989, <br />regarding the disposal of operating solutions and reclamation of the <br />Pregnant Pond at the test heap area. <br />The information which you have supplied indicates that the minor amount of <br />return solution present in the Pregnant Pond has a free cyanide content of <br />0.18 parts per million. This is below the detoxification standartl of 0.20 <br />parts per million established for the San Luis Project. <br />Based upon industry practice and site conditions, the application of this water <br />to roads at the office area would be acceptable provided that the following <br />conditions are met: <br />1. The detoxified solution will be applied only to roads within the <br />approved permit area (M-8812) in such a manner so as to preclude <br />surface (overland) flow of this solution. <br />2. The Pregnant Pond liner will be ripped and punctured upon <br />back filling in such a manner so as to encourage preciplltation <br />infiltration through the liner upon site reclamation. <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />