My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37267
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:19 PM
Creation date
11/21/2007 3:28:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
11/6/1992
Doc Name
BATTLE MOUNTAIN GOLD CO 04/23/1991 VIOLATION REPORT OF PROGRESS TOWARD MEETING BOARD ORDERED
From
DMG
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ ~ III IIIIIIIIIIIII III ~ <br />STATE OF <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, CO 80203 <br />Phone: (3031 866-3 567 <br />FAX: (3031 832-8106 <br />DATE: November 6, 1992 <br />T0: Mined Land Reclamation Board <br />FROM: Larry D. Oehler ~""~- 1~~• ~~~'~ <br />OF' CO~ <br />R~ 9 <br />Ne> b <br />~o <br />r t <br />~ rB Tb <br />Roy Ramer <br />Governor <br />Michael B Lnng <br />Division Dneuor <br />RE: Battle Mountain Gold Company, April 23, 1991 Violation, <br />Report of Progress Toward Meeting Board Ordered Abatement <br />Items, File No. M-88-112 <br />Battle Mountain Gold has been operating the INCO cyanide <br />detoxification system since October 21, 1992 and reports that the <br />system is operating properly. Regular bi-weekly water sampling was <br />conducted by B.M.G. on October 26-27, 1992. Their outside lab, <br />Core Laboratory, has not yet returned analytical results of that <br />sampling. Battle Mountain has been conducting in-house analyses of <br />their waste stream water and reported that samples taken November 4-5, <br />1992 show the following results: <br />November 4, 1992 November 5, 1992 <br />Spigot 0.66 W CN <br />Upper Tailings Pond 0.15 W CN <br />Lower Pond 1.3 Total CN Lower Tailings Pond 0.45 W CN <br />Upper Pond 0.73 Total CN Collection Pond 25.5 W1~D CN <br />Battle Mountain Gold is clearing a pad area at the north est corner of <br />the main tailings embankment to place their hydrogen per~xide tank for <br />treatment of the collection pond, as agreed to by Andre' Douchane at <br />the August hearing. <br />Jim Stevens and Jim Dillie are reviewing B.M.G.'s respon~es to the <br />Division's adequacy review of technical revision No. 8 roposed <br />Modification to the Ground Water Monitoring Plan" and technical <br />revision no. 9 "Surface Water and Ground Water Containment Plan for <br />Tailings Area". <br />RCG/Hagler Bailly, Inc. will start third party sampling vyork on <br />November 23, 1992 and will be accompanied by the Division's <br />representative Dr. Harry Posey. <br />/ern <br />
The URL can be used to link to this page
Your browser does not support the video tag.