Laserfiche WebLink
III IIIIIIIIIIIII III ~ <br />BATTLE MOUNTAIN RESOURCES, INC. <br />July 19, 1994 <br />JUL 2 5 ]g94 <br />Mr. Larry Oehler f,~,._._,... <br />Division of Minerals and Geology ~.,:~,,,,,, c~~ioca"1OUNywAn"v <br />1313 Sherman Street , Room 215 (..~ ~ `" 1"~ ,";~;y ~ ~~ ~:cey <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luir; <br />DMG Permit No. M-88-112 <br />Old Heap Leach Reclamation Update <br />Dear Mr. Gei~ie3.: <br />This letter is provided to update the Division on the status <br />of the reclamation of the Old (ESI) Heap Leach area. The <br />reclamation of this area is addressed in section E.4 .:? of <br />the original permit application and section E.3.1 of the <br />permit amendment. <br />As outlined in BMRI's letter dated August 23, 1993, the <br />reclamation of the ESI hear. was planned for Fall 1993. Due <br />to the limited availabilit}~ of local contractor equipment., <br />the removal of spent ore from the heap site was postponed to <br />Summer 1994 as updated in BMR.I's Or_tober 26, 1993 letter to <br />the Division. <br />Reclamation activities are scheduled to begin the weelc of <br />July 25 and continue for approx~.mately ~:ne month. The <br />reclamation activities will follow the program outlined in <br />the approved permit and detailed i*~ the A;7aust. 33, 19'33 <br />letter to the Division. Contouring and top soil spreading <br />will take place during the late summer in preparation for <br />fall seeding. <br />ii you nave any questions, please call. <br />Sincerely, <br />~Qno p/ ~~ <br />Alana L. Scott <br />Technical Superintendent <br />cc: Anne Baldrige <br />Dan Robertson <br />A SUB.SID/ARY OF BA7TLL MU Uf?TIN GOLD COMPANY <br />P.O. BOX 31U SAN LUIS. COLORADO ril 152-0310 1719167?-?362 FAX (719) 672-3363 <br />