Laserfiche WebLink
UTII.ITY LINES - GRAVEL PRODUCTS - EXCAVATION <br />~,: <br />~x ;: <br />;mod. ,: <br />~~ <br />~:~ <br />PARKERSON CONSTRUCTION, INC. <br />February 28, 2002 "~ <br />710 S. 15i° Stceet <br />Grand junction, Colorado 81501 <br />(970) 242-8134 <br />Fax (970)242-8977 <br />M ~~~®~~® <br />Oivisiogo/A~'' ZQ~ <br />Mines/s °° <br />r <br />FE8 182002 ~ <br />~vared .kutG~aae Pia9d ll'Nice <br />~lerisbn o4 A~t~rale & Geob9Y <br />Division of Minerals & Geology / ~°°loar ®E11i1/ER ®FFlCE <br />Grand Junction Field Office ~®LiC ~ COPV <br />101 South 3`d Street ~~~~1990-09~/ <br />Grand Junction, CO 81501 ~°' ~a~~rD l,;P,°e s,~ <br />ATT: Russ Means <br />RE: Orchard Grove Industrial Park Pit~M1990-094' <br />This letter is to correct the problem noted on the inspection report for the <br />Orchard Grove Industrial Park Pit. The inspection date was 1-10-02. As the <br />pictures show, steel posts were driven on the boundary alignment. This <br />should now clearly identify the boundary. If you have any questions, please <br />call. <br />Sincerely, <br />Alan Park on (Vice-President) <br />Parkerson Construction, Inc. / <br />Enclosure included: Picture (3) <br />