Laserfiche WebLink
iii iiiiiiiuiiii iii <br />999 • <br />BATTLE MOUNTAIN RESOURCES, INC. <br />November 24, 1993 <br />Mr. Larry Oehler _ ~a; <br />Division of Minerals and Geology _ - """ <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />t~ <br />nE MountAlN <br />G( D COMPANY <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luis <br />DMG Permit No. M-88-112 <br />Confirmation for Embankment Raise, South Abutment <br />Dear Mr. Oehler: <br />This letter is written to confirm the Divisions verbal <br />approval to continue construction of the embankment raise, <br />south abutment. <br />Prior to initiating construction of the Phase II embankment <br />raise at the south abutment, the issue of the liner cover <br />material in this area was discussed with the Division in <br />accordance with the revised section 7.5 of the technical <br />specifications. Approximately 0.17 acres of cover material <br />in this area contains a slightly greater percentage of fines <br />than specified. The drainage blanket material in this area <br />will never be in contact with tailings as the embankment <br />covers it. <br />On November 19, 1993, BMRI received verbal approval from the <br />Division to proceed with construction of the south abutment. <br />If you have any questions, please call. <br />Sincerely, <br />~o.,a ~ SCE <br />Alana L. Scott <br />Environmental Engineer <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />A 5'URSlDIARY OP R,I17LR M1fOU~~Td/N GOLD COMPANY <br />P.O. BO%310 SAN LUIS. COLORADO 5115L01f0 (7 191 672-316: FAX (719)6T_-}363 <br />