My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35585
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:09 PM
Creation date
11/21/2007 2:42:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
Enforcement
Doc Date
10/12/1993
Doc Name
SETTLEMENT AGREEMENT
Violation No.
CV1993105
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />STATE OF <br />RADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1317 Sherman 51., Room 215 <br />Denver, CO 80203 <br />Phone (303) 866-3567 <br />FAX: (303) 832-8106 <br />Cessation Order No. <br />SETTLEMENT AGREEMENT <br />OCT 12 jgg~ <br />~l!'IC'CU (y , <br />'..Itc•u: is L. <br />cU~gy <br />Notice of Violation No. C-93-105 <br />Mine Name: Colorado Coal Mine No. 1 Permit No.: C-81-024 <br />Permittee: Kaiser Steel Resources <br />Mailing Address: P.O. Box 37, Desert Center, CA 92239 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: Huerfano Type of Mine: Surface/Private <br />~F ~n<o <br />'_. .. \~ <br />R~ A <br />Fri <br />~ rB i6 ~' <br />Roy Romer <br />Governor <br />Michael B Long <br />D ie ision Director <br />The Division of Minerals and Geology ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on September 14, 1993, the Division and <br />the operator hereby agree as follows: <br />1. The amount of the penalty shall be $400.00; <br />2. the penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems app riate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8) <br />DATE: /O-7 93 <br />DIVISION OF MINERA <br />DATE: ~! - ~-? ~3 By <br />nce urrlcer <br />8888E <br />
The URL can be used to link to this page
Your browser does not support the video tag.