Laserfiche WebLink
~ <br /> <br />STATE • III IIIIIIIIIIIIIIII <br />999 <br />OF COLORADO ' <br />DIVISION OF MINERALS AND G EOLOGY <br />Department of Natural Resources <br />1313 Sherman Sl., Room 215 J <br />y <br /> <br />Denver. Colorado 80203 l <br />~~ <br /> <br />Phone: 1303) 866-3567 I I <br />FTX: U03)d32-8106 <br /> DEPARTMEN"I' OF <br /> NATURAL <br /> RESOURCES <br />To: Mike Lonq Ra Romer <br />Y <br /> ~ Governor <br />From: Barbara 1, <br />Pavlik J lames 5. Lochhead <br /> Eneculrve Dveaor <br />Date: January 5, 1995 Michael 8. Lang <br /> Division D~reaor <br />Re: Sxteasion of NOV (C-94-028) Abatement Past 90 Days <br />Coal Ridge No. 1 Mine (C-84-065) <br />Please approve the extension of the abatement for the above <br />referenced NOV. The final abatement step cannot be completed at <br />this time because of the snow cover and mud conditions at the Coal <br />Ridge No. 1 Mine. According to rule 5.03.2(2)(c)(iv), an extension <br />of the time for abatement can be granted if climatic conditions <br />preclude abatement within 90 days. <br />c:c84065nv.ext <br />