My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35187
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:50 PM
Creation date
11/21/2007 2:31:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
3/20/2001
Doc Name
FOIDEL CREEK MINE C-82-056 MISSED WATER MONITORING FOR WATER YEAR 2000
Violation No.
CV2001004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiiiiii <br />999 <br />Foidel Creek Mine C-82-056 <br />USGS 800: 4 field parameters <br />2 full suite samples <br />Site 8: 4 field parameters <br />4 flow measurements <br />2 full suite samples <br />USGS 900: 4 field parameters <br />2 full suite samples <br />Site 1002: 4 field parameters <br />4 Flow measurements <br />2 full suite samples <br />Site 27A: <br />4 field parameters <br />4 flow measurements <br />2 full suite samples <br />Site 305: <br />Site 16A: <br />USGS 700: <br />03/20/2001 <br />4 flow measurements <br />Missed water monitoring for Water Year 2000 <br />Site 69: 2 full suite samples <br />Sulfate sample missed during site 115 <br />discharge from 10/19/00 to 10/25/00.' <br />Site 1005: 2 full suite samples <br />Sulfate sample missed during site 115 <br />discharge from 10/19/00 to 10/25/00.' <br />Site 301: One weekly EC reading missing 8/16/00 <br />and 9/1/00 <br />Site 29: August 2000 sulfate sample <br />MC-1: 2 field parameters <br />2 flow measurements <br />2 full suite samples <br />Site 1003: 2 full suite samples <br />Sulfate sample missed during site 115 <br />discharge from 10/19/00 to 10/25/00.' <br />2 full suite samples `Exhibit 14 Table A (pg. 14-9 dated 1/28/00) states, <br />"If site 109, 115 or both discharge during a month <br />4 field parameters sites 1003, 301, 69 and 1005 will be sampled for EC <br />and sulfate, even if these sites only discharge once during <br />2 full suite samples the month. The sample will be obtained within 24-36 hours <br />of the site(s) discharging, or if the site(s) will be discharging <br />for more than one day no later than 24-36 hours after the <br />discharge ceases." <br />The Division reads this as: if site 109 discharges, <br />EC and Sulfate samples will be collected. If site 115 <br />discharges, EC and Sulfate samples will be collected. <br />If one site is discharging and then the second site begins <br />to discharge, samples reflecting the combined discharge <br />will be collected at the downstream sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.