Laserfiche WebLink
J. E. STOVER & ASSOCIATES ~/ <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />September 3, 2004 <br />Steve Shuey <br />Division of Minerals and Geology +/" <br />101 South 3r° Suite 301 <br />Grand Junction, CO 81501 <br />Re: Maverick Sand & Gravel `~/ d•'~/ <br />Allen Pit Permit No. M-2002-g9'~ <br />_ Regular (1 i2) Operation _ _ <br />Request for Partial Bond Release ~- <br />Dear Mr. Shuey: <br />. ~~_~- -° <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />~iaC@jygd <br />SEPpB,q~~ <br />Grand Junction Field O,~ <br />Division of Minerals & G@g(g~~ <br />The follow information comprises Maverick Sand & Gravel's application for a partial bond release for its <br />Allen Pit, Permit No. M-2002-49. <br />1. No land has been disturbed at the Allen Pit. <br />2. Therefore, no reclamation has been performed to date and no reclamation was pertormed during <br />the preceding year. <br />3. No disturbance is anticipated to occur during the upcoming year, therefore no reclamation will be <br />pertormed during the upcoming year. <br />4. Since there are no plans to open the Allen Pit in the foreseeable future, Maverick Sand & Gravel <br />hereby requests that a potion of its $71,075 reclamation bond be released to reduce the financial <br />burden on the property. <br />5. The basis for calculating the residual bond is to allow for the disturbance and reclamation of two <br />of the maximum 15 acre pit as follows: <br />DMG Task DMG Bond Amount <br />a. 03a-Rip 15 Acres ............................................... $ 3,629 <br />b. 04a -Replace Topsoil 15 Acres .........................................4,782 <br />c. 05a- Revegetate 15 Acres ............................................ 21,437 <br />d. 06a -Transport Reclamation Equipment .................................. 1,248 <br />Total for 15 Acres ........:..-..:.. - ..........................:........... $-31,096 <br />Proportional totalfor2 Acres .................................................. 4,146 <br />Burden 18% ................................................................ 746 <br />Residual Bond Amount .................................................... $ 4,892 <br />6. The amount of bond to be released is $66,183 ($71,075 - $4,892) <br />Please call if you have any questions. <br />Sincerely, <br />~~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Certified Mail, Montrose County, Marilyn Allen, Lila Williams <br />