My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-25_REVISION - M1988081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988081
>
2006-09-25_REVISION - M1988081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 2:08:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988081
IBM Index Class Name
Revision
Doc Date
9/25/2006
Doc Name
Cost Summary Form
From
DRMS
To
File
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/5-i--0 ~ <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM ~ <br />PROJECT IDENTIFICATION <br />Date : 25-Sep-2006 / Permit or job no.: M-1988-081 ~ Site :Phil Sheridan Lode <br />User : ESC Abbreviation : none State :Colorado <br /> Filename: M081-000 Counly :Boulder <br />Agency or organization name : DRMS <br />Permit or job action : Reevaluate Amount o/Required Bond <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Secure Shaft Closure mineseal 1 4.0 $500 <br />002 -Remove Mine Structures mineseal 1 40.0 $1,633 <br />003 -8ackfill Site to Achieve 3h:1v dozer 1 3.3 $548 <br />004 -Revegetate Affected Land revege 1 8.0 $2,904 <br />005 -Mobilization/Demobilization mobilize 1 3.1 $1,461 <br />• includes inflation factor atljusfinent of <br />NA <br /> <br />SUBTOTALS : 58.4 <br />TOTAL DIRECT COST' <br />OVERNEAD AND PROFIT- Liability lDSUranCe: 2.02 %Oi dlrBCt total= $142 <br />Performance bond : 1.05 % of direct total = $74 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $705 <br />'not requln.M (ar eqp. operaPor serves as super) TOTAL O 8 P = $921 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct*08 P)= $7,967 <br />Financial wartanty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % o/cntr. NA total = $398 <br />CONTINGENCY - NA' NA total = NA <br />'contingencies accounted ror at task level TOTALINDIRECT COST= $1,319 <br />TOTAL BOND AMOUNT (direct + Indirect) _ $8,365 <br />
The URL can be used to link to this page
Your browser does not support the video tag.