Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />SCHMALZ CON$TRU(v ~ ION LTD. <br />P.O. Box 1105 <br />GUNNISON, COLORAD081230 <br />(303) 641-2014 (~ F(j E I V E D <br />idovember 17, 1994 <br />NOV 21 1994 <br />Division of Mrrjerais 8 Geology <br />State of Colorado <br />Division of f^.inerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Hollenbeck Pit, File Leo. td-85-023, Notice of ViolatiJon No. t1-94-04 <br />Attn: Bob Cswald <br />Dear t,r. Oswald: <br />As your memorandum of October 17 indicates, there are selveral <br />jurisdictions involved in the above referenced matter indluding the <br />BLM, the Department of Health, Gunnison county, etc. <br />;•~e believe we are in substantial compliance with the Cease and <br />Desist Order in that the following actions have been take: <br />:`.sphalt is removed from site <br />Corrective Action Plan has been submitted to Health Department along <br />with response to their request for additional information <br />Discussions have been ongoing with the ELP"_ <br />It is my understanding that the BL:D' is agreeable to working out an <br />easement for the power pole and part of the roadway afteri the <br />remediation work (which must first be approved by the He alth Dept). <br />As you are aware, we have diligently attempted to resolveithis matter <br />with as little delay as possible. <br />Enclosed is our check in the amount of $2,500.00 which islthe civil <br />penalty proposed in the Cease and Desist Order. P'e understand that <br />the Order remains in effect until all terms have been satlisfied. <br />per~t~'l~yj y urs <br />7 ~% / <br />Fred Schmalz <br />President <br />Utility Construction Specialists <br />AN EQUAL OPPOHfUNITY EMPLOYER <br />