My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-16_REVISION - M1981021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981021
>
2007-03-16_REVISION - M1981021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:22 PM
Creation date
11/21/2007 1:56:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981021
IBM Index Class Name
Revision
Doc Date
3/16/2007
Doc Name
Recalc of Bond Amount/ Notice of Bond Increase
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />YY'-E DIVISION OF RECLAMATION, MINING AND SAFETY <br />l ~ Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />March 16, 2007 <br />V <br />Terry Wetz <br />Qa International Uranium (USA) Corp. <br />1050 Seventeenth Street, Suite 950 <br />RECEIVED <br />MAR 19 2001 <br />Division of Reclamation, <br />Mining and Safety <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />- ~t- <br />SAFETY <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cottony <br />Division Director <br />Natural Resource Trustee <br />Denver, CO 80265 <br />V / <br />Re: West Sunday Mine, Permit No. M-1981--021, Recalculation of Bond Amount, for <br />Technical Revision TR-3, Notice of Bond Increase. <br />Dear Mr. Wetz, <br />I have completed the bond recalculation for the West Sunday Mine, to update unit costs <br />and to include the changes made under TR-3. The total bond amount has increased from <br />$33,399, a figure from the Division's 1997 recalculation, to the new total of $67,108. <br />The enclosed packet of reclamation tasks explains the components of the updated bond <br />figure. <br />It should be noted that the revegetation costs contained herein reflect the seed mix that <br />was approved under TR-3 and not a more recent seed mix apparently required by the <br />BLM, for this permit and/or other permits in the group of Sunday Mines. To change a <br />permit's reclamation plan to conform with recent BLM requirements, will require that a <br />technical revision (TR) be approved for each of the applicable permits. There is no fee <br />for a TR on 110(2) permits; the TR fee fora 112 permit (such as this one) is $150. <br />Technical revisions for DMOs cost $875. At this time none of the permits are DMOs. <br />Please review the enclosed figures cazefully and contact me promptly if you notice errors <br />or omissions. This letter constitutes notice of a bond increase, which must be submitted <br />within 60 days of the date of this mailing. <br />Please be reminded that if the permit is to be transferred to Denison Mines, the bond <br />(consisting of both financial warranty and performance warranty) must be submitted with <br />the new operator name also. <br />If you need any bond forms, please contact Ms. Elizabeth Shelton at our Denver office <br />(see address in letterhead) or by calling her directly at 303-866-4084. If you have <br />questions about the bond figures themselves, I can be reached at the Division's Durango <br />office: 701 Camino del Rio, Room 125, Durango, CO 81301. <br />~C6 <br />~~ <br />4A8 <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.